Description:
SouthCoast Homes and Construction undertook the development of the new slipway extension at the Naval Base in the Cork Harbour. The complete design and build of this 60-metre-long and 8-metre-wide extension was carried out by SouthCoast. The design, which is valued at 140000 euro, features reinforced concrete and rock armouring.
Title: Naval Base Slipway
Client: Navy
Design Team: SCHC
Value: €140,000